How to report across your old and new ERP during a migration

By the Junction team · Published 18 November 2026 · 7 min read

The short answer

Most guides to ERP migration stop at go-live. Controllers know the hard part starts there: the old system still holds years of job cost, the new one holds today, and the questions from owners, sureties and project managers do not care which system the answer lives in. This guide is about reporting across both.

Why do you need to report across both systems during a migration?

No migration moves everything on one day. Jobs started in the old system finish in the new one, history stays behind or arrives only in part, and finance still has to close months, answer a surety and brief owners. For that stretch, two systems hold one set of books, and every report needs both.

Two terms are worth fixing. A parallel run is a period when the old and new systems both process the same business so their results can be compared. A cutover is the date the new system becomes the system of record. The old system does not stop mattering at cutover, because someone will still ask what it held.

What is the bridge period?

The bridge period is the whole stretch in which an answer depends on two systems. It has three stages: running both side by side, cutting over, and keeping the old history queryable for as long as anyone needs it. Planning all three, not only cutover day, keeps reports trustworthy.

StageWhat is trueWhat people askWhat goes wrong
1. Run alongsideBoth systems process the business, or the new one is loaded and being checkedDo the two systems agree on cost to date, committed cost and billing for the same job?Differences are found late, by hand, in spreadsheets
2. Cut overThe new system becomes the system of record from a chosen period endWhat did we cost and bill on this job across the cutover date?Reports split at the cutover date, so no single figure for a job that straddles it
3. Keep historyThe old system is frozen, but its history is still neededHow did this job compare with the last three similar jobs, including the ones in the old system?History is hard to reach, or the old server is kept running only to look things up

What are the five ways to report across old and new?

Teams usually pick one of five routes: stitch spreadsheets by hand, migrate all history into the new system, copy both into a data warehouse, freeze the old system as an archive, or connect to both live. They differ in effort, in how current the answer is, and in how many copies of your data exist.

RouteHow it worksStrengthDrawback
Spreadsheet stitchingExport a report from each system and combine them by handNeeds no new toolSlow, error-prone, stale on the day it is saved, and nobody can see where a number came from
Migrate all historyLoad every year of old transactions into the new systemOne system to queryCostly to map and prove, and many projects load only a limited window of history
Data warehouse copyLoad both systems into a warehouse on a schedule and report from thatOne place to join old and newA project before the first answer, a second copy to secure, and a lag
Frozen archiveKeep the old database or an extract of it as a stored copyPreserves the history without the old applicationStill needs a way to query it, and it is separate from the new system
Live connection to bothAn MCP connector reads the old and new systems when a question is askedCurrent answers from both, one set of permissions, nothing copied to buildBoth systems must be reachable, and the old one must stay available

Published guidance backs the mix. A consulting firm describing legacy history for Dynamics GP lists keeping a database online, moving it to the cloud, using a data lake, and merge views that blend old and new transactions, with controls to avoid double counting (RSM). A Sage consulting partner says historical data migration usually consists of two years of data (Baker Tilly), which leaves older years to be reached some other way.

What do finance teams check during a parallel period?

Finance teams typically close one period in both systems and reconcile before retiring the old one, and they tie opening balances in the new system to the old trial balance. In construction, add job cost, committed cost, billings, retainage and WIP, because those are the figures a bonded contractor cannot get wrong.

  1. Close one period end in both systems and compare the results (DualEntry describes this as a parallel close).
  2. Tie opening balances in the new system to the old closing trial balance as of the cutover date.
  3. Compare cost to date, committed cost, billed to date and retainage for every open job.
  4. Rebuild the WIP schedule from the new system and compare it with the last one from the old.
  5. Record every difference with its cause before the old system is retired.

The full list is in the job cost and WIP tie-out checklist. Differences usually come from cost codes that do not line up, so see how to map cost codes between old and new.

How does asking both systems at once work with an AI assistant?

Connect the old system and the new one to the same MCP connector, add the connector to Claude, ChatGPT, Gemini or Copilot, and ask a question in plain language. The connector reads each system, applies each person's permissions, and the answer names which system each figure came from.

Questions to ask across both systems

  • For each open job, show cost to date, committed cost and billed to date from the old system and from the new system side by side, and flag any job where they differ.
  • Which vendors have invoices in the old system that are still unpaid, and do the same vendors appear in the new system?
  • For jobs that started before the cutover date, what is the total cost across both systems?
  • List cost codes used in the old system in the last two years that have no match in the new system.

What should you decide before cutover?

Decide four things early: which data moves and which stays behind, how the old history will be reached, which checks must pass before the old system is retired, and who may see what in each system. Writing them down before cutover turns a stressful month into a checklist.

Frequently asked questions

Can I query my old and new ERP at the same time?
Yes. Connect both to an MCP connector such as Junction, add it to your AI assistant, and ask one question. The answer is read from each system when you ask, so it is current, and it shows which system each figure came from.
How long should the old and new ERP run in parallel?
Finance guides commonly describe closing at least one period in both systems and reconciling before the old one is retired. Firms that move in phases, or with long jobs still open in the old system, keep both longer. Your controller and auditor should set the rule.
Do I need a data warehouse to report across old and new systems?
No. A warehouse is one route and it means building and securing a second copy first. A live connection reads the systems where they are, so there is nothing to build before the first answer.
What happens to my old ERP data after cutover?
It stays wherever you keep it, so decide early how it will be reached. Options include leaving the old database in place, storing an extract, copying it to a warehouse or connecting to it live.
What is the difference between a parallel run and a cutover?
A parallel run is a period when both systems process the business so results can be compared. A cutover is the date the new system becomes the system of record. A parallel run usually comes before the cutover.